Below are the tubes in the living room, and below that, the finshed poured Gypcrete floor.
Below are the tubes looking back through the bathroom hallway to the back bedroom, and below that, the Gypcrete floor over the tubes. One of the very last things I'll do is put on a bamboo floor over the Gypcrete.
I got my garden in very late, as I was planning on doing it the first week in June, but because of my injuries, didn't get it in until mid-July. I'm amazed that everything grew so fast and I'm actually going to get a full crop of tomatoes, peppers, cucumbers, squash, and cantelope.
One of the best things to happen was the start of the stucco. Although the manufacturors of the FasWall say stucco can be applied directly to the FasWall blocks with no wire mesh, my stucco contractor, Everlast Stucco, didn't want to do that. He would have had to put the wire mesh on the wooden gables, but he also put it on the blocks, which was fine with me. The two pictures below show the wire mesh installed.
Finally, the brown coat (yes, I know it's grey in color) is on. I had just sprayed it before I took the picture. I'm spraying the entire house every day for 10 days to cure the brown coat so it won't crack. Everlast Stucco will come back next Monday to apply the stucco finish. The outside is actually looking like a real house now.