Thursday, September 25, 2008
1st lift completed, 1st pour completed
Tuesday, September 16, 2008
Walls are going up!
Sunday, August 31, 2008
A Big Hole
People have been asking me since March when I was going to break ground. I kept saying "soon", but soon never happened. It finally happened last Wednesday, but it was delayed so I wasn't even there to see it! I had waited at the site for about two hours Wednesday morning. The dump trucks were lined up, Joe Haaf was there, the backhoe operator was there, but no backhoe. I finally left and went to work, and I guess the backhoe got there shortly after I had left. Oh, well. I had waited so long for that day and I missed it!
I'll post some pictures here, so people will really believe me. No big hitches in digging. There was a large pipe coming out of the ground which was embedded in concrete and rebar. It was meant to be a very sturdy pipe. There was a lot of speculation as to what was on the bottom end. Was it a well, or and underground tank? I was convinced it was a post for a carousel or merry-go-round. I'm not what it was for, but the good news is that there was nothing at the other end. Another small hitch was that there was a small dump in the middle of the lot that had a lot of building rubble; big hunks of concrete and some other junk. I'll have to pay extra for that to be disposed of. The third thing was that the ground is clay, not sand. There was a couple feet of sand under the top soil, but clay underneath that. The soil borings I had done, which went down 8 feet, showed just sand, not clay. I'm not sure exactly how that will affect things, but I guess sand is more stable than clay, so we would rather have had sand. Lucky I decided against a sand pit under the house, or I would have had to haul sand in for it.
Before digging.
Concrete rubble.
Monday, August 25, 2008
We're Finally Breaking Ground!!!
I’m assured that the trucks are lined up for tomorrow morning and the ground breaking will happen FOR SURE. I know I’ve said we’re going to start many times before, but the money and permit are in hand, and Joe Haaf of Rock Solid Concrete Services, who is doing the excavation and much of the building of the house, says that Tuesday, August 26th, is the day.
Tuesday, August 5, 2008
It's Final! Closing on August 7th
The appraisal came in at an amount I can live with, and the closing will be on Thursday, August 7th. So I'm finally going to get started. I contacted Joe Haaf at Rock Solid Concrete this morning to let him know I'm ready to go next week, and hopefully he'll be able to work me into his schedule pronto. Joe is doing the excavation, the masonry, and a lot of the work inside. He's kind of been "on hold" since May, when I thought we'd get started. But I had delays with the building permit (not being submitted in a timely manner), and then I didn't push getting the financing through as fast as I normally would have, since I knew it was going to take 6-8 weeks to get the permit. That was a critical error, as the bank suspended all construction to perm loans a few days before I was supposed to close, and I had to switch to yet another bank for the construction loan.
Now the pressure is on. There is a LOT of detail work that has to be decided (by me), things like exactly where the windows are going, where each electrical outlet will be, colors for the walls, the roof, what kind of wood for the floors and the color, etc. It's kind of overwhelming, but it will be worth it in the end.
I hope to have the actual date for the groundbreaking soon!
Now the pressure is on. There is a LOT of detail work that has to be decided (by me), things like exactly where the windows are going, where each electrical outlet will be, colors for the walls, the roof, what kind of wood for the floors and the color, etc. It's kind of overwhelming, but it will be worth it in the end.
I hope to have the actual date for the groundbreaking soon!
Monday, July 28, 2008
Financing at Last!
It looks like we're actually going to close on the construction loan next week, and get started the week of August 11th. The appraisal has not been completed yet, so that's still a concern. The last appraisal came in at only 83% of the estimated construction costs. This was mostly due to the neighborhood and the high number of foreclosures there, which were used as comparable properties. I'm hopeful that the new appraisal will focus more on the construction costs than comparables.
Actually, the new loan is a better rate with better closing costs than the one I had (or almost had) before, so maybe it's all for the best. I hate getting started so late, though. I had planned to break ground in April, and now it's not going to happen until mid-August. I'm keeping my fingers crossed, hoping nothing else goes wrong and I actually close on the 7th.
Actually, the new loan is a better rate with better closing costs than the one I had (or almost had) before, so maybe it's all for the best. I hate getting started so late, though. I had planned to break ground in April, and now it's not going to happen until mid-August. I'm keeping my fingers crossed, hoping nothing else goes wrong and I actually close on the 7th.
Sunday, July 20, 2008
Mortgage Meltdown Hits Home
Things have been going fast and furious the past few weeks. My stress level has been way up, because my mom fell and broke her wrist a month ago, and two weeks ago had to have surgery to put in a plate because it wasn't healing correctly. So I've had to take 3 1/2 days off work in the past two weeks to take care of her and get her to doctor appointments. My full-time job keeps me very busy, and I've been getting behind with all the time off I've been taking.
The issue that has me the most upset is the call I got Friday from Contractors Capital Corporation, where I was getting my construction loan. This 45 day process has been ongoing for 3 months now, not due to any problems on my part. I am absolutely the perfect candidate for lending money to, in every respect. So what's the problem? First it was the loan officer got pneumonia and no one else could help me for the two weeks he was out. Then he sent me a slew of papers to sign, which had all the blanks left empty. I don't sign blank paperwork. That took another week or two to straighten out. Then there were problems with his appraiser, and the appraisal took an entire month. It finally got to the title company, and we were supposed to close this week. Until I got a call on Friday telling me the underwriter had withdrawn permission for CCC to write construction loans, effective immediately. So now I'm back to square one after three months of working with CCC. The only positive thing is that the bank that was underwriting CCC has taken over the construction loan business from CCC, so much of what has been done so far will transfer over. The really bad news is that MI Bank will NOT accept the appraisal that CCC had done, which I paid $450 for. So now I have to pay for a new appraisal with the same underwriter-now-construction-loan-lender, and have to worry once more about the house appraising way under the construction costs due to the neighborhood it's in. This is all related to the mortgage meltdown; after banks and mortgage companies spent years lending huge amounts of money to people who couldn't pay it back, now they are skittish about lending money to anyone. So this new development wasn't aimed at me, it's part of the overreaction by banks trying to cover their rear ends for their past irresponsible practices.
Adding to the stress are continuing conflicts with Richard, the architect. He has not been at all happy with changes Jeffrey Swainhart, my GC Consultant, and I have made. Some of the changes have been minor, but the major ones have Richard in kind of a snit. I am having Innovative Power Systems (IPS) do the solar, and most likely White Bear Mechanical will do the radiant in-floor heating. Richard has been set all along at having Norm Tesmar do both, but the guy can't give me any references, even though he supposedly has been doing this for 20 years. He isn't licensed, either, so he can't do it himself anyway. I have been unhappy with Norm and his complicated solar system with both tanks and an under-the-basement sand pit for heat storage. IPS is an established company. If I have problems, I'll know who to call, and I know someone will be there to answer the phone. In addition, I'm taking out the sand pit, as both IPS and Bob Ramlow (who wrote the book, literally, on solar heat and sand bed heat storage) have recommended against it in this case. It's also saving me about $5000, and now I don't have to worry about living above an oven in the lower level. The other issue is the skylight over the stairwell. Richard had initially designed a cupola over the stairwell, with an elevated roof with widows around it to let in light and ventilation. That turned out to be quite an expensive addition. Then Richard decided a large skylight, 5 feet by 20 feet, would be better. It wouldn't open, so he proposed adding a window in the rear gable, near the peak, to add the ventilation. I loved the skylight proposal, but it was going to be around $6000 just for the plastic skylight. There were many seams in it, which I didn't like. One seam goes bad and the whole thing starts leaking. I wanted to put in some regular skylights instead. Jeffrey came up with a good plan putting in three 3' x 4' skylights, with one being operable for ventilation. I feel more confident that this system will be less likely to cause problems (with leaking) over the long term.
So the bottom line on the project is that the new bank said it would be 2 to 3 weeks at a minimum to get the construction loan approved, so my plans to break ground this week have been put on hold.
I know that all projects have things go wrong, and I'm just hoping that I'm getting all the kinks out before we even start, and that once we start digging, everything will go relatively smoothly.
The issue that has me the most upset is the call I got Friday from Contractors Capital Corporation, where I was getting my construction loan. This 45 day process has been ongoing for 3 months now, not due to any problems on my part. I am absolutely the perfect candidate for lending money to, in every respect. So what's the problem? First it was the loan officer got pneumonia and no one else could help me for the two weeks he was out. Then he sent me a slew of papers to sign, which had all the blanks left empty. I don't sign blank paperwork. That took another week or two to straighten out. Then there were problems with his appraiser, and the appraisal took an entire month. It finally got to the title company, and we were supposed to close this week. Until I got a call on Friday telling me the underwriter had withdrawn permission for CCC to write construction loans, effective immediately. So now I'm back to square one after three months of working with CCC. The only positive thing is that the bank that was underwriting CCC has taken over the construction loan business from CCC, so much of what has been done so far will transfer over. The really bad news is that MI Bank will NOT accept the appraisal that CCC had done, which I paid $450 for. So now I have to pay for a new appraisal with the same underwriter-now-construction-loan-lender, and have to worry once more about the house appraising way under the construction costs due to the neighborhood it's in. This is all related to the mortgage meltdown; after banks and mortgage companies spent years lending huge amounts of money to people who couldn't pay it back, now they are skittish about lending money to anyone. So this new development wasn't aimed at me, it's part of the overreaction by banks trying to cover their rear ends for their past irresponsible practices.
Adding to the stress are continuing conflicts with Richard, the architect. He has not been at all happy with changes Jeffrey Swainhart, my GC Consultant, and I have made. Some of the changes have been minor, but the major ones have Richard in kind of a snit. I am having Innovative Power Systems (IPS) do the solar, and most likely White Bear Mechanical will do the radiant in-floor heating. Richard has been set all along at having Norm Tesmar do both, but the guy can't give me any references, even though he supposedly has been doing this for 20 years. He isn't licensed, either, so he can't do it himself anyway. I have been unhappy with Norm and his complicated solar system with both tanks and an under-the-basement sand pit for heat storage. IPS is an established company. If I have problems, I'll know who to call, and I know someone will be there to answer the phone. In addition, I'm taking out the sand pit, as both IPS and Bob Ramlow (who wrote the book, literally, on solar heat and sand bed heat storage) have recommended against it in this case. It's also saving me about $5000, and now I don't have to worry about living above an oven in the lower level. The other issue is the skylight over the stairwell. Richard had initially designed a cupola over the stairwell, with an elevated roof with widows around it to let in light and ventilation. That turned out to be quite an expensive addition. Then Richard decided a large skylight, 5 feet by 20 feet, would be better. It wouldn't open, so he proposed adding a window in the rear gable, near the peak, to add the ventilation. I loved the skylight proposal, but it was going to be around $6000 just for the plastic skylight. There were many seams in it, which I didn't like. One seam goes bad and the whole thing starts leaking. I wanted to put in some regular skylights instead. Jeffrey came up with a good plan putting in three 3' x 4' skylights, with one being operable for ventilation. I feel more confident that this system will be less likely to cause problems (with leaking) over the long term.
So the bottom line on the project is that the new bank said it would be 2 to 3 weeks at a minimum to get the construction loan approved, so my plans to break ground this week have been put on hold.
I know that all projects have things go wrong, and I'm just hoping that I'm getting all the kinks out before we even start, and that once we start digging, everything will go relatively smoothly.
Subscribe to:
Posts (Atom)